GENERAL INFORMATION
The work consists in replacing and installing the metering outfit:
– The Electricity Company disconnects the plant.
– Disposition of ground protection.
– Disconnection of high voltage terminals of metering outfit present up to this moment.
– The Electricity Company disconnects the low voltage terminals of the metering outfit present up to this moment.
– A truck crane is in charge to dismount the metering outfit.
– A truck crane is in charge of the disposition of the new metering outfit 50-100.
– Connection of medium voltage (MT) terminals to transformer.
– The Electric Company connects the low voltage terminals of the transformer.
– The Electric Company replaces fuse start up threads of the street.
– Removal of ground protection.
– Closing of fuse disconnectors.
– The Electric Company is in charge to calibrate the multi-fee system.
– Measure of voltages and sequence of phases.