Date: May of 2010
Company: MPyH

  • Check electrical, mechanical and visual.
  • Disarmament, cleaning and washing of core and coil of the transformer.
  • Rewind full leg 2 failed.
  • Installation of new system of restraint for coils and structure.
  • Impregnation by immersion vacuum all the coils manufactured with dielectric coating class H.
  • Change of hardware and parts in bad state.
  • Covered repair exterior.
  • Installation system of monitoring of digital temperature of 3 channels with relay communication.
  • Removal of rust and painting epoxy type (Pearl Grey) weather treatment.
  • Complete electrical testing in our laboratory according to standards ANSI C-57.12.90, with issuance of certificate of testing respective.