Date: July of 2011
Company: ME

  • Trials with instrumentation, to view status of your circuit internally.
  • Cleaning and washing of transformer active part (coils and nucleus.)
  • Heat treatment oven, for evacuation of humidity of the active part.
  • Change of welded lid cover apernada.
  • Change of valve for drainage.
  • Adaptation and installation of level with auxiliary contacts and connection box circuits assistants.
  • Change of insulators wells, inserts bushing and elbows.
  • Installation of Toolbox control.
  • Standardization of basis of Sub station, which is twisted.
  • Standardization of suspenders of grills.
  • Replacement of its endowment of oil.
  • Test of tightness.
  • Washing pond.
  • Treatment of painting.
  • Change of packings in Acryl nitrile.
  • Trials and tests for certification.